ER HQ - Build Progress

The ER Productions new HQ build at Panorama is steaming ahead, with the external structure already up in place.

 

A lot of progress has been made in the last 3 weeks - with all the piling and foundations complete, we are very pleased to see the steel structure finally in place and the cladding underway. Works are moving ahead on schedule, so we should be watertight by April!

 

 

As you can see, our new HQ is situated on the bank of the River Thames, with stunning views across the water. Being strategically located adjacent to the QEII Bridge and the M25 London Orbital Motorway means that we will be perfectly placed to access the rest of the UK, Europe and International airports.

 

We have also had some very exciting meetings this week with our Architects, RHJB, regarding the interior design and layout. We will be sharing some first-look visualizations of the bespoke design in our next blog in the New Year. For now, check out these floorplans to get a better idea of the internal size and scope of our project!

 

Ground Floor

First Floor